Heathrow Airport Terminal 2

Overview of Project

The construction of the new Terminal 2 at Heathrow Airport

  • Structural Steelwork Architectural Metalwork
  • General Metalwork
  • Structural Glazing

CLIENT

HETCo

PACKAGE VALUE

£26m

CONTRACTOR

HETCo

ARCHITECT

Pascal & Watson

Project Details

Front of house: design, manufacture and installation of balustrades, glazed void balustrades with inegrated lighting, full height glazed screens, bollards, buggy rail / trolley rails, aluminium decking, FID tree bases and column cladding.

Back of house: design, manufacture and installation of chequer plate wall lining, M&E access bridge structure, aluminium decking to the bridge structure, bollards, protection barriers, step-ups and Ramps and general metalwork.

For more information on our services or a quote for your project please contact us:

From Concept to Installation

Established in 1969, CMF Ltd was grown to be one of the UK’s leading Architectural Metalwork and Structural Steelwork specialists. We have been involved in the design, fabrication and installation of a large number of prestigious projects throughout the UK.

Our experienced and highly skilled design, production and site teams enable us to produce products of the highest standard for use across a wide range of industry sectors.

From our 55,000 square foot factory in West London we can manufacture architectural trusses up to 30m long and 10 tonnes in weight. We are continually investing in the latest machinery and software to enable us to provide a state of the art design and manufacture service to our clients.