The construction of the New Wembley Stadium the largest sports venue in the UK
WNSL
£7m
Multiplex
Foster and Partners and HOK Sport
CMF Ltd designed, manufactured and installed both the internal and external metalwork packages. The internal metalwork comprises galvanised mild steel balustrades and handrails to the main stadium bowl, pitch invasion barriers, disabled platforms and removable vomitory stairs.
Around the external perimeter of the stadium we designed, manufactured and installed stainless steel and galvanised mild steel balustrades and handrails to the concourse area, and also the bespoke stainless steel balustrades and handrails to the VIP staircase at the main entrance of the stadium.
Established in 1969, CMF Ltd was grown to be one of the UK’s leading Architectural Metalwork and Structural Steelwork specialists. We have been involved in the design, fabrication and installation of a large number of prestigious projects throughout the UK.
Our experienced and highly skilled design, production and site teams enable us to produce products of the highest standard for use across a wide range of industry sectors.
From our 55,000 square foot factory in West London we can manufacture architectural trusses up to 30m long and 10 tonnes in weight. We are continually investing in the latest machinery and software to enable us to provide a state of the art design and manufacture service to our clients.