Heathrow Airport Terminal 5

Overview of Project

The construction of the new additional Terminal at Heathrow Airport

  • Structural Steelwork Architectural Metalwork
  • General Metalwork
  • Structural Glazing

CLIENT

BAA

PACKAGE VALUE

£21m

CONTRACTOR

BAA

ARCHITECT

Richard Rogers/Pascal & Watson

Project Details

The design, manufacture and installation of the architectural metalwork package was awarded to CMF Ltd as a first tier supplier to BAA on the construction of Terminal 5 at Heathrow Airport.

Our works included front of house stainless steel barriers including trolley corrals, low-level trolley rails, escalator barriers and headroom barriers around staircases in the main and ancillary terminal buildings.

For more information on our services or a quote for your project please contact us:

From Concept to Installation

Established in 1969, CMF Ltd was grown to be one of the UK’s leading Architectural Metalwork and Structural Steelwork specialists. We have been involved in the design, fabrication and installation of a large number of prestigious projects throughout the UK.

Our experienced and highly skilled design, production and site teams enable us to produce products of the highest standard for use across a wide range of industry sectors.

From our 55,000 square foot factory in West London we can manufacture architectural trusses up to 30m long and 10 tonnes in weight. We are continually investing in the latest machinery and software to enable us to provide a state of the art design and manufacture service to our clients.